1 purpose
1.1 In order to ensure that the finished product meets the established quality standards and customer needs, as well as the unqualified products in the inspection process can be effectively controlled
The product status is clarified, easy to identify and easy to trace, and this procedure is specially formulated.
2 range
2.1 Applicable to inspection and testing of all finished products.
3 Duty
3.1 Quality Department: It is the management department of this procedure, responsible for the formulation and implementation of this procedure.
3.2 Warehouse: Responsible for the submission of finished product shipment inspection applications and product shipments.
3.3 Manufacturing Center: Responsible for submitting applications for finished product warehousing inspection and handling defective products.
4 definition
4.1 Finished product warehousing inspection: FQC will inspect and test the products according to the inspection specifications before the products are warehousing.
4.2 Finished product shipment inspection: Before the product is shipped, OQC will inspect and test the product, packaging, labeling, etc. according to the shipping inspection specification.
5 Flow chart (see attached page)
6 contents of homework
6.1 Finished product inspection standards:
6.1.1 The finished product inspection standards are formulated by QE, proofread by the product engineer, and approved by the person in charge of quality, and then distributed to the relevant departments by the document control center
carried out.
6.1.2 The inspection standards for finished products should be based on technical specifications, control plans, drawings, and the "Quality Assurance Agreement" signed by both parties and other relevant documents
Formulate.
6.1.3 The inspection standards for finished products shall include inspection items, random inspection methods, acceptance criteria, inspection methods, and handling of defects.
6.2 Finished product warehousing inspection:
6.2.1 Inspection notice: After the finished product is completed, the manufacturing center initiates a completion inspection form in HEP and informs FQC to carry out finished product inspection.
6.2.2 Sampling inspection: FQC conducts sampling inspections of the products to be put into the warehouse according to the requirements of finished product inspection specifications. FQC shall conduct sampling inspections for each batch of products.
Sampling inspection, sampling samples should be representative.
6.2.3 If the customer has blasting requirements, the finished product shall be tested by blasting before entering the warehouse, and the blasting quantity shall not be less than 4pcs/batch. The fluid chamber takes 3 months as
In one cycle, the blasting test will be doubled every 3 months. During the product abnormal risk assessment, the blasting test shall not be less than 10pcs.
6.2.4 Inspection records: FQC records the relevant inspection data in the [finished product inspection report] based on the inspection results, and judges it.
6.2.5 Processing of inspection results:
A.
When the inspection is judged to be qualified, FQC passes the [product warehousing list] in the HEP system, and covers "QC PASS" on the certificate or the outer box
Chapter, release the product.
B.
When the inspection is judged to be unqualified, FQC will identify and isolate the defective products, and follow the "non-conforming product management procedures"
Good products are processed.
6.3Finished product shipment inspection:
6.3.1 When the warehouse manager receives the [Sales Invoice], before the products are shipped, they should confirm whether there is a [Factory Inspection Report], and
Confirm the sluggish time.
6.3.2 The sluggish time, the old voltage is more than 7 days, and other products are more than 15 days; or there is no [factory inspection report] before delivery, the warehouse
The administrator must notify OQC to carry out outbound inspection in accordance with the outbound inspection specifications.
6.3.3 If the customer has blasting requirements, when the semi-finished and sluggish products are placed for 8-30 days, the blasting quantity shall not be less than 4pcs/batch. Semi-finished products,
When the sluggish product is placed for 31-60 days, the blasting quantity shall not be less than 6pcs/batch. In other cases, the blasting quantity shall not be less than 8pcs/batch.
6.3.4 The inspection results are recorded in the [Ex-factory Inspection Report Form] and judged and handled.
6.3.5 When the product is judged to be qualified, the product will be released for shipment after stamping the "QC PASS" seal on the outer box of the product or marking it as required by the customer. Judge
When it is unqualified, after OQC identifies and isolates the defective product, the defective product shall be handled in accordance with the "non-conforming product management procedure".
6.4 Finished product quality statistics:
6.4.1 FQC shall register the finished product quality inspection status in the [Finished Product Inspection Quality Registration Form] and submit it to the process quality supervisor for summary every day.
The main management summarizes the quality registration form submitted by FQC and submits it to the quality department manager.
6.4.2 The OQC shall register the quality status of the finished product shipment inspection in the [Finished Product Inspection Quality Registration Form] and submit it to the quality department manager every day.
6.4.3 According to the analysis of quality statistics and the achievement of quality objectives, the Quality Department shall follow the "Corrective and Preventive Measures Management Procedures" when rectification is required.
carried out.
6.5 Quality-related materials are archived and stored in accordance with the "Records Management Procedures".
7 Related documents
7.1 "Product Certification Management Procedure"
7.2 "Key Components Confirmation and Inspection Specification"
7.3 "Regulations for Routine Inspections"
7.4 "Production Part Approval Procedure"
7.5 "Non-conforming Product Management Procedure"
8 Application form
8.1【Product Warehousing List】
8.2【Finished Product Inspection Report】
8.3 [Confirm the inspection plan]
8.4【Routine Inspection Record】
8.5【Sales Outgoing List】
8.6【Factory inspection report sheet】
8.7【Product Inspection Quality Registration Form】